• Respond refill, drain, leak check, audit (PCS) and part replacement based on level of skill\n• Daily task – Coolant level tracking sheets\n• FSR CPM – Need to CPM by due date (3days) after FSR date\n• After CPM, FSR needs to be dropped off at the PCS office and needs a signature from PCS Engineer\n• Bring it back to the office for scan CPM.\n• Compressor vibration check, chiller level label check and coolant amount (Main & CU)\n• Organize : Cage, tool boxed, tools, coolant and broken parts \n• Participate in the upcoming projects with an engineer (Coolant cap)